Where your additional rates are going
In 2026/27 the IPART approved Special Variation to rates will add $35 million to the budget to address the backlog of works and maintenance.
The Special Variation funding includes:
- $15 million for improving roads, footpaths and stormwater infrastructure
- $11 million invested in community facilities, town centres, rockpools, wharves, playgrounds and grass mowing
- $6 million to expand tree maintenance and planting, compliance services, environmental and natural risk reduction programs and disaster management
- $3 million towards future projects including female friendly sports facilities, and more wharf and town centre improvements in 2027/28.
Track our progress
You can track as we receive the additional rates income, and see progress of projects planned for 2026/27. Projects funded by the Special Variation as well as normal rates, grants and other sources are listed.
We'll mark projects complete as they are done, updated quarterly. [Last update: July 2026].
Review the projects delivered in the first year of the Special Variation (2025/26).
Funds received
2026/27 footpath and walking trail improvements, fully or partly funded by the Special Variation (SV)
(weather permitting)
- BALGOWLAH HEIGHTS - Construct new footpath in Abbott Street and Lewis Street on the northern side and eastern side between the raised pedestrian crossing and Balgowlah Heights Public School
- FRENCHS FOREST - Construct new footpath along eastern side of Athol Street
- FRESHWATER - Construct new footpath along northern side of Undercliff Road
- KILLARNEY HEIGHTS - Detailed design for reinstatement of Flat Rock Track
- Increase footpath maintenance, including line marking of shared paths
- Increase preventative maintenance of bridges including vegetation clearing, painting, handrail and decking repairs
2026/27 full capital program for footpath and walking trail improvements (excluding SV projects)
Footpath works (weather permitting)
- ALLAMBIE HEIGHTS - Construct new footpath on Madison Way between Aquatic Centre Car Park and Aquatic Drive
- ALLAMBIE HEIGHTS - Footpath renewal Condamine Street, corner of Kentwell Road
- AVALON BEACH - Construct new footpath along unformed path between Elaine Avenue and Yellow Brick Road
- AVALON BEACH - Footpath renewal Wickham Lane
- BALGOWLAH - Construct new footpath along Maretimo Street between Violet Street and Upper Beach Street
- BELROSE - Construct new footpath on Merelyn Road between Glen Street and Blackbutts Road
- BELROSE - Construct new footpath on Waldon road between Forest Way and Dell Street
- BILGOLA BEACH - Foreshore cycleway access
- BROOKVALE - Construct new footpath on Miles Street between Ada Avenue and Ethel Avenue
- BROOKVALE - Footpath renewal and new pram ramps on Wattle Road, between Harbord Road and Ethel Street
- COLLAROY - Construct new footpath on Anzac Avenue between Pittwater Road and Seaview Parade
- DEE WHY - Design and community engagement for the upgrades of The Strand
- DEE WHY - Footpath renewal Lewis Street
- FRENCHS FOREST - Construct new footpath from number 12 to 14 Rodborough Road
- FRENCHS FOREST - Construct new footpath on Pound Avenue between Mimosa Street and Yindela Street
- FRENCHS FOREST - Footpath renewal on Warringah Road, between 16 Rodborough Road to 2 Courtley Street
- KILLARNEY HEIGHTS - Construct new footpath on Tralee Avenue between Bangar Close and Glengariff Avenue
- MANLY - Footpath renewal Bower Lane / Marine Parade
- MANLY - Footpath renewal on Upper Gilbert Street, between James Street and Rowe Street
- MANLY VALE - Footpath renewal Quirk Road, between Lovett Street and Campbell Parade
- MONA VALE - Footpath renewal Surview Road
- NARRAWEENA - Footpath renewal at Willandra Villages Retirement Community, from Little Willandra Road to Alkira Circuit
- NORTH BALGOWLAH - Construct new footpath along Coramba Street between Taree Avenue and Eileen Street
Walking trail improvements (weather permitting)
- CLONTARF - Fisher Bay Bridge trail renewal
- MANLY - Renewal of boardwalk ramp, timber stairs on West Esplanade
- MANLY VALE - Routine trail asset renewals at Manly Dam
- NORTH HARBOUR - Renewal of stone stairs at Wellings Reserve
- WARRIEWOOD - Trail renewal on sections of Warriewood Wetlands
For a full list of 2026/27 capital works projects visit the map.
2026/27 roadworks and maintenance fully or partly funded by the Special Variation (SV)
Operational uplift in road maintenance (weather permitting)
- Approximately 5,700m of additional road resheeting, repair, microsurfacing, rejuvenation and kerb and gutter replacement (as required)
- Bus stop renewals to ensure compliance, including improvements to concrete slabs, tactiles and seats
- Accessibility improvements to ferry wharves
- One new bus shelter
- Additional pedestrian crossings, lighting, traffic calming and improved parking management
- 10 streets for heavy patch pavement repairs to address recurring pothole issues subject to extent of damage and location of roads
- Additional 30 streets identified to undertake preventative crack sealing works
- 10 retaining walls planned to be cleared of invasive vegetation to prevent root jacking and associated minor wall repairs subject to the extent of works required at each wall
- Increase maintenance of road, footpath and drainage on Scotland Island and Western Foreshores
- Targeted road grading and shoulder maintenance of unsealed roads in Terrey Hills, Duffy’s Forest, Ingleside, Belrose and Oxford Falls
Road resheeting (weather permitting)
- BEACON HILL - Road repair and rejuvenation of Mary Street
- BELROSE - Road repair and microsurfacing on Bundaleer Street
- BELROSE - Road repair and microsurfacing of Karalta Crescent
- BELROSE - Road repair and rejuvenation of Calool Crescent
- BILGOLA PLATEAU - Road repair and rejuvenation on Bilberry Avenue
- COLLAROY - Road repair and rejuvenation of Jamieson Parade
- CURL CURL - Road repair and resurfacing of Carrington Parade
- DUFFYS FOREST - Road repair and resealing of Thuddungra Road
- FAIRLIGHT - Repair and resurfacing of Griffiths Street
- FRENCHS FOREST - Road repair and rejuvenation of May Gibbs Way
- FRESHWATER – Road repair and microsurfacing of Surfers Parade
- INGLESIDE - Road repair and resealing of McLean Street
- NEWPORT - Road repair and resurfacing of Ismona Avenue
- NORTH CURL CURL - Road repair and microsurfacing on Playfair Road
- NORTH CURL CURL - Road repair and rejuvenation of Jamieson Avenue
- TERREY HILLS - Road repair and rejuvenation of Cooyong Road
- TERREY HLLS - Road repair and rejuvenation of Currong Circuit
- WHEELER HEIGHTS - Road repair and microsurfacing of Ettalong Street
- WHEELER HEIGHTS - Road repair and microsurfacing of Penrith Avenue
Kerb and guttering (weather permitting)
- BELROSE – Renewal of kerb and gutter in Bundaleer Road
- BELROSE – Repair of kerb and gutter in Calool Crescent
- BELROSE – Repair of kerb and gutter in Karalta Crescent
- CURL CURL – Renewal of kerb and gutter in Carrington Parade
- CHURCH POINT – Construction of missing link at 226-230 McCarrs Creek Road
- FAIRLIGHT – Renewal of kerb and gutter in Griffiths Street
- FRESHWATER - Renewal of kerb and gutter in Surfers Parade
- NORTH CURL CURL - Renewal of kerb and gutter in Playfair Road
- WHEELER HEIGHTS - Renewal of kerb and gutter in Ettalong Street
- WHEELER HEIGHTS - Renewal of kerb and gutter in Penrith Avenue
Traffic facilities (weather permitting)
- Increased maintenance of traffic facilities, including line marking and signage on roads
Retaining wall renewals (weather permitting)
- MANLY - Retaining wall renewal works 21-25 Kangaroo Street
- MANLY - Retaining wall renewal works 41-55 Kangaroo Street
2026/27 roadworks full capital program (excluding SV projects)
Road works (weather permitting)
- CHURCH POINT - Upgrades to Pittwater Road and McCarrs Creek Road
- CROMER - New footpath and upgrade of 2 existing pedestrian crossings Carawa Road
- CROMER - Pedestrian crossing upgrade South Creek Road
- FRESHWATER - Cycleway on Oliver Street
- KILLARNEY HEIGHTS - Pedestrian crossing upgrade Melwood Avenue
- MANLY VALE - Install raised threshold and raised pedestrian crossing Quirk Road
- MONA VALE - Pedestrian crossing upgrade Park Street
- MONA VALE - Pedestrian refuge upgrade Oliver Way
- NORTH CURL CURL - Install pedestrian crossing Headland Road
- SCOTLAND ISLAND - Pavement construction with drainage improvement on Thompson Street
Road resheeting (weather permitting)
- BALGOWLAH - Repair and resurfacing of Maretimo and New Street West
- BELROSE - Repair and resurfacing of Glen Street
- BILGOLA BEACH - Road repair and resurfacing of Allen Avenue
- BILGOLA BEACH - Road repair and resurfacing of Bilgola Avenue
- BROOKVALE - Road repair and resurfacing of Wattle Road
- CLONTARF - Repair and resurfacing of Moore Street
- CLONTARF - Repair and resurfacing of Peronne Avenue
- DEE WHY - Repair and resurfacing of May Road
- FORESTVILLE - Repair and resurfacing of Ryrie Avenue
- FRESHWATER - Road repair and resurfacing of Carrington Parad
- NORTH CURL CURL – Repair and resurfacing of Griffin Road
- SEAFORTH - Road repair and resurfacing of MacMillan Street
- TERREY HILLS - Road repair and resealing of Larool Road
Kerb and guttering (weather permitting)
- BALGOWLAH - Kerb and gutter renewal in Maretimo Street and New Street
- BELROSE - Kerb and gutter repair in Glen Street,
- BILGOLA BEACH - New kerb and gutter in Bilgola Avenue
- BILGOLA PLATEAU - Kerb and gutter renewal in Allen Avenue
- BILGOLA PLATEAU - New kerb and gutter in Allen Avenue
- BROOKVALE - Kerb and gutter renewal in Wattle Road
- CLONTARF - Kerb and gutter renewal in Moore Street
- CLONTARF - Kerb and gutter renewal in Peronne Avenue
- CURL CURL - Kerb and gutter renewal in Griffin Road
- DEE WHY - Kerb and gutter renewal in May Road
- FORESTVILLE - Kerb and gutter renewal in Ryrie Avenue
- FRESHWATER - Kerb and gutter renewal in Carrington Parade
- SEAFORTH - Kerb and gutter renewal in MacMillan Street
Traffic facilities (weather permitting)
- MANLY - Raised pedestrian crossing Commonwealth Parade
- NARRABEEN - New traffic facilities as part of the Safer Neighbourhoods program
- NORTH MANLY - Shared user pedestrian crossing on Kentwell Road
- WARRIEWOOD - Warriewood Valley Boondah Road upgrade including road upgrade, cycle and pedestrian paths, culvert upgrade, roundabout construction, new pedestrian crossings and lighting, improved drainage and planting and landscaping
Retaining wall renewals (weather permitting)
- AVALON BEACH - Slope stabilisation at Park Avenue
- BAYVIEW - Log wall renewal at 1987-1989 Pittwater Road
- CHURCH POINT - Landslide remediation works on McCarrs Creek Road
- ELVINA BAY - Renewal of timber seawall Normanhurst Street
- MANLY - East Esplanade Seawall renewal
- MANLY - Seawall minor renewal at Manly Ocean Beach
- NORTH NARRABEEN - Seawall renewal at Lakeside Park
- SEAFORTH - Ellery Punt Reserve seawall renewal - design
For a full list of 2026/27 capital works projects visit the map.
2026/27 playground, reserve and sporting facility improvements and works fully or partly funded by the Special Variation (SV)
(weather permitting)
- AVALON BEACH - Dunbar Park improvements as part of the Avalon Place Plan implementation
- AVALON BEACH - Landscape improvements at the northern end of Avalon Beach Reserve
- AVALON BEACH - Playground renewal in Avalon Beach Reserve
- BROOKVALE - Renewal of Grandstands at Brookvale Oval
- CROMER - Design works for female friendly sports facilities at Cromer Park Field 1
- FRENCHS FOREST - Refurbishment of Warringah Aquatic Centre including grandstand, amenities, yoga room and planning for roof repairs
- MANLY - New lighting for Kangaroo Reserve – design
- MONA VALE - New lighting for Village Park – design
- QUEENSCLIFF - Playground renewal in Crown Road Reserve
- WARRIEWOOD - Design for lighting at Katoa Reserve
2026/27 playground, reserve and sporting facility capital improvements and works (excluding SV projects)
Playground works (weather permitting)
- AVALON - Playground renewal at Palmgrove Park
- COLLAROY PLATEAU - New playground and associated landscaping in Parkes Reserve
- CURL CURL - Playground renewal in Stirgess Reserve
- FORESTVILLE - Playground renewal in Brown Street Reserve
- MANLY - Playground renewal at Manly Lagoon Reserve
- MONA VALE - Playground renewal in Briony Reserve
- NORTH CURL CURL - Playground renewal in Makim Reserve
- SEAFORTH - Playground renewal at JAF Fenwick Park
Reserve improvements and sporting facility works (weather permitting)
- AVALON - Careel Bay Sports Amenities renewal - design and planning
- BELROSE - Waldon Road Reserve Sports amenities refresh
- CLONTARF - Clontarf Reserve masterplan implementation - carpark improvements, new gym equipment and three point basketball hardcourt
- COLLAROY - Drainage renewal Griffith Park sportsfield
- CURL CURL - Refresh of bathrooms in sports amenities at Abbott Road and Spring Road
- DEE WHY - Dee Why Oval 1 Drainage
- DEE WHY - Dee Why Oval 2 Drainage
- DEE WHY - Dee Why Park Sports amenities renewal
- FORESTVILLE - Planning for synthetic turf renewal on Melwood Oval
- FRENCHS FOREST - Lighting Renewal at Lionel Watts Reserve Synthetic Field
- FRENCHS FOREST - Upgrade to Akora Reserve
- FRESHWATER - Harbord Park Field 2 drainage
- KILLARNEY HEIGHTS - Building works on Killarney Heights Oval sports amenities
- MANLY - Female friendly change rooms and top level upgrades at Manly Oval Pavilion
- MANLY - Ivanhoe Park - new/upgraded infrastructure, drainage works and renewal of paths and paving
- MANLY - Landscape improvements as part of Shelly Beach Masterplan Implementation
- MANLY - Renewal of lights at East and West Esplanade
- MANLY - Shelly Beach Reserve pathway
- MANLY VALE - Design improvements to Picnic Areas 3 and 4 at Manly Dam
- MONA VALE - Upgrade of Kitchener Park Sports Amenities to be female friendly
- NEWPORT - Expansion of Newport Oval Sports Amenities – design
- NORTH MANLY - Manly Aquatic Centre renewal works including sauna fit-out, installation of a circulation pump and replacement of a boiler
- NORTH MANLY - Redevelopment of the Warringah Recreation Centre
- NORTH NARRABEEN - North Narrabeen Reserve Masterplan Implementation - planning for a new sportsfield (Field 7) and car parking
- PALM BEACH - Infrastructure renewal and upgrade in line with the Governor Phillip Reserve masterplan
- SEAFORTH - Construction of new beginner / intermediate skills bike park at Seaforth Oval
- WARRIEWOOD - Detailed design for proposed hard court installation on Fields 6/7, Boondah Reserve
- WARRIEWOOD - Renewal of Boondah Road sports amenities
- WARRIEWOOD - Upgrade of sportsfields 2 and 5 at Boondah Reserve
For a full list of 2026/27 capital works projects visit the map.
2026/27 operational enhancements to natural risk reduction and capital stormwater works fully or partly funded by the Special Variation (SV)
(weather permitting)
- Increased hazard reduction burns and maintenance across 38 fire trails and 303 Asset Protection Zones
- Increased management of high priority invasive weeds (e.g. aquatic weeds) and vertebrate pest management (e.g. rabbits, foxes)
- An additional 15,000 hours of bushland regeneration works (including 8,000 hours already included for 2025/26), targeting high priority bushland reserve sites and undertaking works across 13 unmanaged bushland areas
- Additional creek rehabilitation works at Wheeler Creek, Cromer and planning for removal of concrete half pipes and rehabilitation planning for Dee Why Creek
- Improved management of geotechnical risks across the Northern Beaches
- Improved management of contaminated lands across the Northern Beaches
- Accelerate the implementation of the Narrabeen Lagoon Entrance Management Strategy
- Reducing the impact of erosion at estuary foreshores (e.g. Pittwater)
- Natural disaster funding to aid recovery and clean up following storms and other unexpected events (funding doubled from 2025/26)
- Investigation of beach nourishment as an adaption option for maintaining beach amenity
Operational uplift in stormwater actions (weather permitting)
- Approximately 12,000m of additional stormwater pipe inspected (includes 2025/26 uplift of approx. 7,000m)
- Improved flood management through augmentation of stormwater network, improvements to warning systems and signage and education and awareness
- Additional maintenance including clearing/jetting of stormwater pipes to prevent blockages at flooding hot spots
- Improved management of water quality from our stormwater network including enhanced maintenance of existing pollution traps and the use of better technology to reduce pollution into our network.
Stormwater works (weather permitting)
- BALGOWLAH HEIGHTS - New Street drainage improvements
- BEACON HILL - Pipe augmentation at Tristram Road
- CLONTARF - Drainage improvement at Clontarf Reserve and Holmes Avenue - design
- DEE WHY - Feasibility study on storage basin options for flood mitigation at Mooramba Road carpark and Redman Road
- DEE WHY - Stormwater outlet investigation for ocean outfall renewal at Dee Why Beach
- MANLY - Drainage upgrades at Balgowlah Road and Alexander Street - design
- MANLY - Ocean outfall renewal works at Raglan and Pine Streets
- NARRAWEENA – Alkira Circuit culvert upgrade
- NEWPORT - Design of a new stormwater quality system at Bert Payne Park
- OXFORD FALLS - Construction of bridge over causeway at Oxford Falls Road West
2026/27 capital stormwater works (excluding SV projects)
Stormwater works (weather permitting)
- BALGOWLAH - Catchment analysis for Cormack Street and surrounding areas
- BILGOLA BEACH - Construction of Bilgola Avenue Drainage Improvement
- BROOKVALE - Creek remediation works on Winbourne Road
- COLLAROY - Renewal of stormwater assets, including stormwater pipes, culverts, pits, outlets, and a gross pollutant trap
- CROMER - Pre-construction works as part of new pipe construction at 1 Geelong Road
- FORESTVILLE - Investigation of inlet capacity at Melwood Avenue
- FRENCHS FOREST - Design and pipe augmentation at 4 Bilbette Place
- FRENCHS FOREST – Gross pollutant trap renewal works at Endeavour Drive rock lined sediment basin
- MANLY - Construction of drainage renewal works at Darley Road
- MANLY - Detailed design and construction of Ivanhoe Park drainage works
- MANLY - Detailed design of Manly stormwater study
- MANLY - Renewal of gross pollutant trap at Ashburner Street
- MANLY - Renewal of gross pollutant trap at East Manly Cove Beach
- NARRAWEENA - Gross pollutant trap renewal, Karoola Street
- NEWPORT - Catchment analysis and pipe augmentation at Prince Alfred Parade
- NORTH BALGOWLAH - Burringbar Headwall renewal and bank stabilisation
- NORTH BALGOWLAH - Design of stormwater solution at Condover Reserve
- NORTH CURL CURL - Abbott Road drainage improvement – construction
- QUEENSCLIFF - Rockpool outlet renewal – construction
- SCOTLAND ISLAND – Catherine Park - Ground shaping and drainage channel works to aid with stormwater performance. Infrastructure renewal and uplift
- SEAFORTH - Detailed design of new stormwater along Battle Boulevarde and Edgecliff Esplanade
- TERREY HILLS - Cooyong Bridge Road culvert renewal – construction
- WARRIEWOOD - Rehabilitation of Narrabeen Creek upstream of the Jubilee Avenue Bridge - planning and design
- WHALE BEACH - Investigation design solution and construction of failed Whale Beach stormwater outlet
For a full list of 2026/27 capital works projects visit the map.
2026/27 uplift to tree, mowing and lifeguard operations, fully or partly funded by the Special Variation
Uplift in tree operations (weather permitting)
- New and succession tree planting including 4 key sites Brookvale, Clontarf, Newport and Frenchs Forest
- Increasing proactive tree work from once every 3 years per ward and high use site to once every 18 months
Uplift in mowing operations (weather permitting)
- Increased mowing program from 11 to 12 cuts per year at over 800 reserve sites
- Increased mowing program from 11 to 19 cuts per year at a further 53 foreshore and high use sites
Expansion of lifeguard service
- 1,870 additional hours to patrol Dee Why Beach 12 months of the year and extend lifeguard operations at other beach locations based on assessment of risk
2026/27 rockpool, tidal pool and community infrastructure improvements fully or partly funded by the Special Variation (SV)
Rockpool works (weather permitting)
- PALM BEACH - Major structural repairs including new floor - design
Tidal pool maintenance (weather permitting)
- Specialist marine tidal pool contractor maintenance and frequency of deep cleans doubled across all 6 tidal pools to keep netting and piles in good condition (funding from 2025/26 doubled)
Community infrastructure improvements (weather permitting)
- BAYVIEW - Bayview wharf renewal
- CHURCH POINT - Repair and resurface Church Point Reserve Car park with drainage improvement
- CURRAWONG - Currawong wharf renewal - design
- GREAT MACKERAL BEACH - Mackeral Wharf renewal
- MANLY - Car park repair at Peninsula carpark
- MANLY - Car park repair at Whistler Street carpark
- MANLY - Relocation and upgrade of accessible amenity at West Esplanade
- NARRABEEN - Detailed design of Jamieson Park Sailing and Recreation Facility
- NARRAWEENA - New bus stop infrastructure Warringah Road opp Alfred Street
- NORTH MANLY - Manly Andrew Boy Charlton Aquatic Centre energy efficient heat pump upgrade
- NORTH NARRABEEN - North Narrabeen shops augmentation
- SEAFORTH - Design of Seaforth village commercial centre upgrade
- Increased carpark maintenance including surface sealing and repairs, and grading and/or sealing, on unsealed carparks
- Increased maintenance of concrete and timber stairways and linkways between streets
Streetscape improvements (weather permitting)
- AVALON - Formalisation of Streets as Shared Spaces in Old Barrenjoey Road, including paving, lighting, shade, seating and landscaping
2026/27 capital rockpool, community infrastructure and streetscape works and improvements (excluding SV projects)
Rockpool works (weather permitting)
- AVALON BEACH – Major renewal of rockpool
- BILGOLA BEACH – Major renewal of rockpool
- DEE WHY - Renewal of rockpool pump well, railing and grate
- FAIRLIGHT - Rockpool renewal - planning
- NORTH NARRABEEN - Rockpool renewal - planning
- NEWPORT – Rockpool renewal - planning
Community infrastructure improvements (weather permitting)
- ALLAMBIE HEIGHTS - Renewal of Allambie Heights Public Hall
- BALGOWLAH - Manly SES - design and improve flood damaged parts of building and training room alterations
- BALGOWLAH HEIGHTS - Renewal of bus stop slab and seat on Beatrice Street
- BELROSE - Planning for Belrose Children's Centre Kitchen refurbishment
- CLAREVILLE - Dinghy storage renewal at Taylors Point
- COLLAROY - Coastal protection works and beach access stairs, Frazer Street and Frazer Reserve
- COLLAROY - Collaroy SLSC amenities refubishment
- COLLAROY - Collaroy SLSC replacement of external door with roller door
- COLLAROY PLATEAU - Renewal of bus stop slab, Hilma Street
- CROMER - Renewal of public amenities at Cromer Community Centre
- CROMER - Upgrade of Cromer Community Centre
- CURL CURL - Structural repair of Curl Curl Youth and Community Centre
- DEE WHY - Dee Why Childcare Centre refurbishments including kitchenettes and flooring
- DEE WHY - Dee Why SLSC - roof renewal, bathroom, first aid room and nippers canteen refurbishment
- DEE WHY - Dee Why Swim Club Amenities refresh
- DEE WHY - Remedial works at the Dee Why Lifeguard Hut
- DEE WHY - Replacement of carpet on the top floor of Dee Why library - planning
- FRENCHS FOREST - Building works at Glen Street Library including replacement of blinds and evening out of slab
- FRENCHS FOREST - Building works including renewal of carpet, seating, air-conditioning system and audio and sound equipment at Glen Street Theatre, Frenchs Forest
- FRESHWATER - Public amenities upgrade Lawrence St, Freshwater
- FRESHWATER - Renewal of Freshwater Beach Lifeguard Hut
- KILLARNEY HEIGHTS - Accessible and ambulant amenity at Killarney Heights shops
- MANLY - Design for the activation of Market Place
- MANLY - Finalisation of North Steyne SLSC roof repairs
- MANLY - Refresh of Little Manly Kiosk public amenities
- MANLY - Remedial works at the Pantry Building, Manly
- MANLY - Renewal of 2 bus stop slabs on Darley Road
- MANLY - Renewal of Lagoon Park amenities
- MANLY - Structural repairs to Roundhouse Children's Centre
- MANLY VALE - Accessibility upgrade of Manly Dam public amenities at Picnic Area 4
- MONA VALE - Fire compliance works and fencing along the top level of Bungan Lane carpark
- MONA VALE - Mona Vale Cemetery new memorial garden, and infrastructure and memorial garden emergency works
- MONA VALE - Improvements to further facilitate 24/7 access to Mona Vale Library
- NEWPORT - Newport SLSC progression towards construction certificate
- NEWPORT - Repair works on Bungan SLSC
- NARRABEEN - Planning of construction of coastal works Clarke Street to Mactier Street
- NORTH NARRABEEN - North Narrabeen Community Centre upgrade of hall and toilets
- NORTH NARRABEEN - North Narrabeen SLSC works
- NORTH NARRABEEN - Sydney Lakeside Holiday Park works - synthetic turf at campsites, air-conditioner renewal in cabins, external painting of cabins, construction of two ensuite blocks and CCTV
- SCOTLAND ISLAND - Scotland Island Community Centre
- SOUTH CURL CURL - Repair works at South Curl Curl SLSC
- TERREY HILLS - Renewal of bus stop slab and seat at German International School
- WARRIEWOOD - Additional fit out of Warriewood Valley Community Centre
- WARRIEWOOD - Upgrade to Ted Blackwood Centre
Tidal pool maintenance (weather permitting)
- BAYVIEW - Tidal pool renewal
Streetscape improvements (weather permitting)
- BALGOWLAH - Streetscape renewal and improvements
- FORESTVILLE - Renewal of sections of paving and streetscape infrastructure at Forestville shops
- NORTH NARRABEEN - Design work to renew streetscape infrastructure at North Narrabeen shops
For a full list of 2026/27 capital works projects visit the map.